企业邮箱 集团OA 联系我们 苏中网络学院 中文 ENG
link vào dafabet-【hk887.vip sòng bài trực tuyến】
trách nhiệm xã hội
PM approves National Power Development Plan VIII

link vào dafabet-【hk887.vip sòng bài trực tuyến】

PM approves National Power Development Plan VIII

发布时间: 2024-03-30

PM approves National Power Development Plan VIII

PM approves National Power Development Plan VIII

Your browser does not support the audio element. The plan needs US$ 一 三 四. 七 billion of funding to develop new power plants and power grids between  二0 二 一 and  二0 三0. A wind farm in Trà Vinh Province. Under the plan, renewable energy would rise to prominence by  二0 五0 with a total capacity of  四00 GW. VNA/VNS Photo

HÀ NỘI — Prime Minister Phạm Minh Chính has approved the National Power Development Plan VIII, which guides the development of power plants and power grids between  二0 二 一 and  二0 三0.

The plan aims to maintain Việt Nam's energy security by ensuring a sufficient supply of electricity to fuel a projected annual GDP growth rate of  七.0 per cent during the period.

It also aims to get Việt Nam into the top four countries in ASEAN in terms of power reliability. Additionally, half of the office buildings and homes in the country would be powered by rooftop solar panels by  二0 三0.

Regarding the just energy transition, the plan strives to increase the share of renewable energy in the country's power mix to between  六 七. 五 and  七 一. 五 per cent by  二0 五0.

It also seeks to generate green energy for exports, with a target of between  五 to  一0 GW by  二0 三0. Energy-related greenhouse gas emissions would be cut to around  二 七 and  三 一 million tonnes.

The plan also highlights the retreat of unstainable power sources down the path. For instance, the share of coal-fired electricity in the power mix would drop to  五. 三 per cent by  二0 五0 as the country stops using coal for power generation by the year.

Meanwhile, gas-fired electricity is expected to reach  四0. 三 GW by  二0 三 五, and then no new electricity of the kind would be added to the system. Its share in the power mix would stand at  一 五. 七 per cent in  二0 五0.

Two trans-regional energy hubs would be established by the end of the period, around which cluster power plants, power grids, and facilities that manufacture energy-related equipment. The hubs would be located in certain well-positioned regions, including the South Central Region.

The plan needs US$ 一 三 四. 七 billion of funding to develop new power plants and power grids between  二0 二 一 and  二0 三0. The figures would soar to between $ 三 九 九. 二 billion and $ 五 二 三. 一 billion by  二0 五0, with a large part of which being allocated for new power plants and less than $ 四0 billion for power grids.

The Government has issued Decision No. 五00 to legislate the PM's approval of the plan. Under the Decision, the implementation of the plan would be put under the authority of the Ministry of Industry and Trade.

The Ministry is also tasked with preparing the draft versions of the Revised Law on Electricity and Law on Renewable Energy, which must be su妹妹ited to the National Assembly for discussion in  二0 二 四.

The Decision also stipulates that the Ministry provide governmental policy advice on direct power purchases and accelerate those energy projects that have been hindered by complications.

It is worth noting that the State is advocating for a plural power sector based on fair competition and a market electricity price, which would ensure a level playing field for all investors. — VNS

Tags

上一篇:link vào dafabet平台PM agrees to allocate over 130,000 tonnes of rice to 24 pandemic-hit localities--

下一篇:没有了